福利视频

  1. Home
  2. Investors
  3. Upstream major projects
  4. 2019 Upstream major projects

Major projects 2019

In 2018 BP started up six upstream major projects in Europe and Eurasia, North Africa and North America, following on from seven successful start-ups in 2017.? Together with the projects already brought on line in 2016 these new projects will make a huge contribution to the 900,000 barrels of oil equivalent per day (mboed) of new production, net to BP by 2021
Major projects 2019

Culzean, UK - North Sea

~30 mboed peak annual average production, net to BP

?

Culzean is a 1.2 Tcf High Pressure High Temperature (HPHT) lean gas condensate field located approximately 140 miles east of Aberdeen in Block 22/25a of the Central North Sea in water depths of 300 feet. The project scope includes a stand-alone three bridge-linked platform development with dry gas export via the Central Area Transmission System (CATS) and liquids export via a new-build Floating Storage and Offloading tanker (FSO).?

?

Completed : 11 June 2019?

Culzean, UK - North Sea
Angelin, Trinidad

Angelin,?Trinidad

~50 mboed peak annual average production, net to BP
?

The Angelin project develops four wells and features the construction of a new platform 40 miles off the southeast coast of Trinidad in water-depth of approximately 215 feet. Gas from Angelin flows to the Serrette platform hub via a new 13-mile pipeline.

?

Completed : 26 February 2019

West Nile Delta - Giza / Fayoum

~50?mboed?peak annual average production, net to BP

West Nile Delta - Giza / Fayoum is the second stage of the West Nile Delta five-field development (following startup of Taurus / Libra?in 2017) from two BP-operated offshore?concession blocks, North Alexandria and West Mediterranean Deepwater.

?

Completed: 2 February 2019

West Nile Delta – Giza / Fayoum, Egypt
Constellation, US - Gulf of Mexico

Constellation,?US - Gulf of Mexico

~10 mboed peak annual average production, net to BP

?

Constellation is a Pliocene discovery located in central Green Canyon. Production from Constellation is tied-back to Anadarko’s Constitution spar in approximately 5,000 feet of water.

?

Completed: January 27 2019

West Nile Delta - Raven, Egypt

~130 mboed peak annual average production, net to BP

?

Raven is the third phase of the West Nile Delta development (following Taurus / Libra and Giza / Fayoum) from two BP-operated offshore concession blocks, North Alexandria and West Mediterranean Deepwater. The Raven project includes 8 wells and will be developed as a deepwater long distance tie back to shore, where the new Raven onshore plant is being built, immediately adjacent to the Giza / Fayoum facilities.

?

Status: On track?

West Nile Delta - Raven, Egypt
偷拍久久国产视频|老司机在线国产|手机看片福利永久国产 天天干-夜夜啪_天天操-天天啪-天天射-天天日-天天撸-天天福利视频 人人操_人人碰_人人碰福利视频_人人干_人人摸_人人看_福利视频97_福利视频福利视频 日本在线加勒比福利视频,福利视频,日本福利视频a不卡免费,免费无码不卡 福利视频在线_福利视频_91国产福利视频视频 国产aⅴ在线福利视频线_中国大陆高清aⅴ毛片_福利视频 无码av高清毛片在线看_日本一级特黄大片_日本毛片福利视频观看_免费v片福利视频网站 大香蕉 大福利视频 大香蕉电影 大香蕉影院 福利视频福利视频福利视频 福利视频大香蕉在线福利视频